Project Name: Fort McMurray Community Centre
Project Address: Abrahams Road, Fort McMurray, AB
Description: The project entails the design of 50,000 square feet multi purpose facility. The facility includes a column-free 20,000 square feet gymnasium, and two levels with a basement multi purpose facility. The main floor slab is suspended concrete slab, while the upper floor is a composite steel-concrete floor system. The foundation is shallow foundation system. The Construction is completed on 2018.
Structural Engineering
Strengthening & Seismic Upgrade
Specialty Engineering
Building Assessment
Investigation & Insurance Claims
Finite Element Modelling
Dynamic & Seismic Analysis
Vibration Analysis
Buckling Analysis
Progressive Collapse Analysis