The development includes the design of an aircraft hanger with 3 bays. The building is a steel building over strip and spread footings. The building feature foldable hanger doors to suit the aircraft width. A wood frame office mezzanine is constructed at the front section of the building. The construction is completed on 2017.

  • Our Services

    Structural Engineering
    Strengthening & Seismic Upgrade
    Specialty Engineering
    Building Assessment
    Investigation & Insurance Claims
    Finite Element Modelling
    Dynamic & Seismic Analysis
    Vibration Analysis
    Buckling Analysis
    Progressive Collapse Analysis